Since it was Valentines Day today we felt that we could do with a more hearty Fika full of energy to boost our souls and body's.
Therefore we got going with Tapio's Serrano Ham and a decent sized cake.
Afterwards we were in need for some serious exercise. So Anders completed the fabrication of the ignition coil bracket.
PA, Anders and I used up another 2% of the Fika energy as we fought with the final bell housing and transmission assembly.
A moment of contemplation. The engine, flywheel, clutch, sensor and transmission are installed. Properly installed.
From another angle, another view.
As well the electrical distribution box was installed while we were in super sugar speed. Now welded to the (formerly nicely painted) frame.
Step by step its coming together.
Meanwhile in another part of the workshop, Carina and Tore was solving our old Ford -46 electrical problems.
In a summary, it's amazing what some kilos of dry pork and cake can contribute with.
We're loving the Valentine Workshop Energy Experience.
No comments:
Post a Comment