Sometime things needs to get hot before they cool down. Currently Anders is working hard to get the cooling pipe plumbing packaged in the Land Speed Amazon.
The Y-connection to the big coolant tank is about to go through a hot birth.
Engine cooler and charge air cooler packaged and fixed in position.
Driver side cooler pack brackets and hoses exposed.
.
Simultaneously, Magnus is working with the rear brakes....hmm...let me see...let's say that we have a complete powertrain (which we have), a proper (not leaking) cooling system (which we'll soon have) and brakes..wouldn't a test drive be a proper thing to do?
That would be cool.
No comments:
Post a Comment